CONTACT QSE KONKRIT

Let’s Start With the RMC Challenge

Whether the issue is production, plant reliability, fleet performance, quality, critical risk, people capability or operating cost, the best place to start is with what is actually happening in your operation.

You do not need to know which QSE Konkrit solution you need. Tell us the problem first.

YOUR OPERATION

What Is Affecting Performance Today?

Select the area closest to the issue you are experiencing.

Production & Batching

  • Production output
  • Batching performance
  • Process discipline
  • Plant utilization

Plant Reliability & Maintenance

  • Recurring breakdowns
  • Downtime
  • Preventive maintenance
  • Equipment reliability

Fleet & Delivery

  • Truck turnaround time
  • Mixer truck utilization
  • Waiting time
  • Delivery-cycle performance

Quality & Process Control

  • Quality variation
  • Rejected loads
  • Returned concrete
  • Process-control issues

Safety & Critical Risk

  • Vehicle movement
  • Maintenance risks
  • Work at height
  • Confined spaces
  • Other critical-risk exposure

People & Capability

  • Plant operators
  • Supervisors
  • Drivers
  • Leadership capability
  • Operational discipline

Performance & Cost

  • Productivity
  • Waste
  • Utilization
  • Cost per m³
WHAT HAPPENS NEXT

We Start by Understanding the Situation

1. Understand

We discuss the issue and understand what is happening in the operation.

2. Identify

We determine where the problem appears to sit and what further information may be required.

3. Recommend

We propose the smallest practical intervention that makes sense for the situation.

No unnecessary complexity. Start with the problem. Determine what is needed from there.

Contact QSE Konkrit

Tell us what is happening in your ready-mixed concrete operation. Send us a mailto: gopala@myqse.my or tel: +60163336385 (Gopala)